La station McGill aura trois entrées - deux dans le tunnel qui relie le Centre Eaton et la Place Montréal Trust et une pour rejoindre le métro. Bref, aucune entrée sur la rue.
Par contre, il y a aussi un étage de locaux techniques juste au dessus des rails.
I know it ain’t happening at all but i would like to have them operate this year if they can and leave the tunnel for the 3rd opening (with a2 being a 4th opening)
Me too, I bet if the orange line connected at Bois Franc, they would’ve done that as there would be a way downtown, but because there isn’t that, they won’t do that sadly
Section 1/2/3 can be delivered with busses from Montpellier to Cote vertu/ Sauve metro station.
Par contre, pour la refonte des reseaux d’autobus, il faut attendre la section 4 pour eviter les problemes de la rive sud.
But when were these announcements made? The last official announcements said everything except the airport branch would be up and running by the end of this year, not just “testing.”