REM - Discussion générale

Je viens d’essayer de planifier un départ le 31 juillet depuis le Dix30 vers le centre-ville…

  • Google Maps
  • Apple Plans
  • Transit
  • Chrono

Toutes les apps proposent encore le service du RTL et non le REM. J’aurais pensé que comme Chrono affiche les départs du REM pour lundi, ça aurait été différent, mais non.

Ce sera pour plus tard :slight_smile:

11 « J'aime »

I think another issue is that RTL hasn’t updated their GTFS to remove buses that go to downtown. I know that the actual change of network won’t be until August 21st, but no buses (that I know, besides in the early morning) will be travelling over the bridge

2 « J'aime »

Le jour J approche…

23 « J'aime »

Try on Transit App now…

I really like their custom icon for the Metropolis train car:
IMG_5592

10 « J'aime »

A journalist got to visit the REM, I’d share the link but it’s on twitter (or x… bleh), here’s the video:

15 « J'aime »

I find it interesting that the line separates into 2 at Gare Centrale…

3 « J'aime »

when you do directions, it would be able to show you which platform to use, depending on the time of the departure. This will only change during rush hours

5 « J'aime »

A lot to share all at once, apologies for all the separate messages!

There are actual ads for the REM on the Métro, by the REM itself, not CDPQ. They’re in the branding of the REM’s website and everything.

8 « J'aime »

That’s fairly representative of the actual position of the tracks and quais.

1 « J'aime »

Mais en fait cette pub est mensongère pour les résidents de la Rive-Sud. Ça devrait être écrit que les nouveaux trajets d’autobus ne sont qu’à partir du 21 août !

https://twitter.com/andystandreTVA/status/1683505492142743554?s=20

2 « J'aime »

En quoi le contenu de la pub est mensonger?

3 « J'aime »

Nouveau trajets de bus exo

1 « J'aime »

Nice

Party à la Gare centrale :tada: :partying_face:

The REM is finally here. You can ride it for free this weekend

Agency wants to generate hype and encourage people to ride new light railway

CBC News · Posted: Jul 24, 2023 12:11 PM EDT | Last Updated: 24 minutes ago

A train whizzes by.
A REM light rail car crosses the Champlain Bridge during testing. (Submitted by JF Savaria)

The Réseau express métropolitain (REM), the massive light rail project whose first line, connecting the South Shore to downtown Montreal, opens this weekend and will be free for the first two days.

On Saturday and Sunday, you can take the REM for no charge from any of its five stations: Brossard, Du Quartier, Panama, Île-des-Sœurs and Gare Centrale.

The trains are currently running. CDPQ Infra, a subsidiary of Quebec’s pension fund manager the Caisse de dépôt et placement du Québec, is conducting tests.

But the agency wants users to get on board, both to stir up hype so people are more inclined to take the REM when it becomes fully operational on Monday, July 31, and to iron out any final kinks.

Between 9 a.m. and 7 p.m. on both Saturday and Sunday, anyone will be allowed to hop on board one of the driverless trains that will be running along the full length of the tracks and which are scheduled to become fully operational on Monday.

As of that date, users will have to pay a fare to board a train.

The ARTM says users can access the REM stations by foot, bike, car or Metro for the Gare Centrale station, which is steps away from the Bonaventure Metro station on the Orange line.

It’s expected to be a party, of sorts, according to the ARTM. Near the Gare Centrale station, there will be music, treats and other surprises to mark the REM’s first day.

The REM has been in the works since 2015. It is the largest public transit project in Quebec in decades.

3 « J'aime »

Dés le 31 juillet J’embarque dans mon REM
Saviez-vous qu’il y a plusieurs nouveaux trajets d’autobus qui se connecteront au REM ?

Cette pub sous-entend que dès le 31 juillet des nouveaux trajets d’autobus se connecteront aux REM. C’est faux se ne sera pas avant le 21 août pour les trajets du RTL

C’est vrai pour la STM sur l’île des soeurs, considérant que la pub est transmise sur le territoire de la STM et non du RTL. L’information de l’RTL est hors de la mission de la STM

1 « J'aime »

Pour deux stations sur cinq la pub est vrai, effectivement. Si ils affichent cette pub sur la rive-sud, ils doivent faire comme sur le site web et ajouter ceci.

Réseau de transport de Longueuil
*À partir du 21 août 2023 seulement. Pour tous les détails, consultez le site web du RTL.

Ah je comprends mieux. Partielle ou équivoque plutôt? “Mensongère” c’est fort.

2 « J'aime »

Ok, j’ai des photos exclusives (ne vous inquiétez pas, je n’ai pas trespass)! Les voici! Celle à l’intérieur, c’est le tunnel de Du Quartier au dessus de l’autoroute. Et celles à l’extérieur, c’est IDS!




28 « J'aime »