Ouvrages d'art Antenne Deux-Montagnes - Discussion

C’est possible mais je ne les ai jamais vu moi-meme

Ici Kami. Je suis au Club Curling Laval-sur-le-Lac pour un Café-rencontre. J’ai réussi à obtenir des carnets pour les bruits sonores du REM. Terminé.

5 « J'aime »

10-4

1 « J'aime »

J’ai rendez-vous demain a Pointe-Claire, de quoi la rencontre café avais l’air aujourd’hui?

2 « J'aime »

Génial ! Je serais présent demain à 14h00 ! :grin: :grin: :clock2: :triangular_flag_on_post:

1 « J'aime »

@anon87793006 @Kami Je tenterai peut-être d’être là demain aussi.

1 « J'aime »

:grin: :grin: :grin: :grin: :+1: :triangular_flag_on_post: :clock2:

5_24-06-Affiches_Bruit_EN.pdf (6.5 MB)
5_24-06-Affiches_Bruit_FR_0.pdf (8.5 MB)

Same doc from yesterday at Ile bigras as what we had for Laval and DM.

I am interested in seeing the new document for thr West-Island branch tonight.

The doc for the DDO & Burrough of P-R that’s on the 22’nd will also be probably different

5 « J'aime »

C’est vraiment bien fait ce document!

6 « J'aime »

Je vais arriver vers 14:10-14:15. J’ai raté ma correspondance parce que le bus a pris du retard sur l’autoroute 20. :melting_face:

@anon87793006 les cartons sont les mêmes que ceux que tu as partagé ici. Ils ont aussi des REM en carton.


3 « J'aime »

Mise à jour pour les curieux des travaux sur le viaduc Toupin. Ils installent un mesh, peut être pour stabiliser la pente. À suivre.



9 « J'aime »

C’est effectivement à ça que sert ce type de mesh. Ils vont le remplir de terre, puis ensemencer le tout. Pour dire les choses comme ça, c’est mieux que rien comme solution. Un demi mur de soudainement pour réduire la pente aurait été préférable. Ce qui a tendance à arriver avec ce type de mesh, c’est que la terre glisse de la portion la plus haute de chaque cellule, mais reste dans la portion basse. Avec le temps, la portion exposé du mesh se dégrade.

4 « J'aime »

Complete obstruction of Chemin-de-Fer Street

ROAD
JULY 29, FOR APPROXIMATELY 10 DAYS, 7 A.M TO 5 P.M
NORTH SHORE

Nature of the work :

Planing and paving work is scheduled to make corrections in the area of the bend on Chemin-de-Fer Street. This work will result in the complete closure of a portion of Chemin-de-Fer Street.

To minimize the time required for mobilization and ensure the integrity of the work, the closure is scheduled to start on Monday, July 29, for approximately 10 days, weather permitting. Flaggers will be present to facilitate automobile, cyclist, and pedestrian traffic. Road users are encouraged to follow the temporary signage in place during this period.

The map below shows the location of the work area and the required detour :

Impacts and mitigation measures :

The goal of the REM project office and the NouvLR consortium is to mitigate the impact on residents and ensure everyone’s safety by implementing appropriate measures.

  • Complete closure of a portion of Chemin-de-Fer Street. A detour route will be set up and indicated by appropriate signage.
  • Possible traffic slowdowns are to be expected in the area.
  • Noise, vibrations, and dust may be generated by this work. Monitoring will be carried out by our environmental experts.
2 « J'aime »

They’re changing the barrier along Pitfield above the REM track. Sadly the view is much worst now :confused:

13 « J'aime »

Holy sh!t does that compressed depth of field make it look horrible! Hahahaha good thing nobody cares about the view from the A13 overpasses!

4 « J'aime »

Ça ne m’étonne pas. Ils utilisent ce grillage partout, comme à Du Quartier par exemple.

4 « J'aime »

Dam they took away my foamer spot for the future testing lol.

2 « J'aime »

Its coming!!!

19 « J'aime »

DAM, was it a mail distribution?
If yes, was the envelope non descriptif or rem branded?

1 « J'aime »