Looks like buses take Meighen as a loop for now
Yep since a few days ago
With the work around the station the buses have a tendancy to shuffle every few weeks/months, often with no warning (or if there is any, i never see it)
L’autre, ça va attendre…
22 août 2024 – Station Pierrefonds Roxboro, mobilier intérieur – Photographe : Ulysse Lemerise
22 août 2024 – Station Pierrefonds Roxboro, extérieur – Photographe : Ulysse Lemerise
L’aménagement extérieur est fini jusqu’à Ile Bigras du nord et jusqu’à Bois-Franc du sud. Il reste juste les deux de Pierrefonds.
Je ne comprend même pas ce qu’on regarde ici ![]()
I’m guessing they’re mad that the station isn’t done yet? Which I can understand, it’ll probably be the last to be finished, but they should have plenty of time before October.
If they’re mad at the viaduct? I can’t see anything weird, so ![]()
Parfois ceux qui chialent ne savent même pas eux-mêmes sur quoi ils chialent…
They’re mad at the construction (i.e. an excavator excavating), because apparently that’s proof of mismanagement or corruption
My guess is that it’s the bike path parallel to the REM, and they had to wait for the rest of the work to be done to start on it. But I might be wrong
c’est le gros bon sens de facebook
aka l’effet dunning kruger
Any post that mentions how they’re “taxpayers” I immediately get a NIMBY attitude, especially on a Facebook group
Not to mention the REM is privately operated so not sure what taxpayers would be paying here
So based on this link, and the plans, they are finishing the parking, walking path, bike path (south of the tracks) and the retention basin to the north of the tracks
I also noticed that the bike path no longer goes out to Rue Meighan in the official plans
I just noticed actually that on the map, the pedestrian link parallel to the tracks (i added it in red) is also missing…
It existed for DM so I doubt they would remove it, if they did then it would pretty quickly become one of those “desire paths” anyways lol
Enfin !
Travaux d’aménagements extérieurs de la station Pierrefonds-Roxboro
Début mai 2025 à juin 2025
Travaux de pavage et finalisation des trottoirs au niveau de la station et des terminus de bus:
- Pavage des stationnements
- Activités de bétonnages
- Travaux de remblai
- Correction des déficiences
Juin 2025 à juillet 2025
Travaux d’aménagement paysager et de finition autour de la station :
- Ensemencement
- Installation du mobilier
- Marquage
- Installation de la signalétique