Station Pierrefonds-Roxboro

Looks like buses take Meighen as a loop for now

1 « J'aime »

Yep since a few days ago

With the work around the station the buses have a tendancy to shuffle every few weeks/months, often with no warning (or if there is any, i never see it)

L’autre, ça va attendre…

22 août 2024 – Station Pierrefonds Roxboro, mobilier intérieur – Photographe : Ulysse Lemerise

22 août 2024 – Station Pierrefonds Roxboro, extérieur – Photographe : Ulysse Lemerise

16 « J'aime »

Photo from NouvLR

12 « J'aime »
9 « J'aime »

L’aménagement extérieur est fini jusqu’à Ile Bigras du nord et jusqu’à Bois-Franc du sud. Il reste juste les deux de Pierrefonds.

3 « J'aime »

Do you guys know what’s going on here? It’s at the 11e Av. crossing.

Je ne comprend même pas ce qu’on regarde ici :stuck_out_tongue:

5 « J'aime »

I’m guessing they’re mad that the station isn’t done yet? Which I can understand, it’ll probably be the last to be finished, but they should have plenty of time before October.

If they’re mad at the viaduct? I can’t see anything weird, so :man_shrugging:

7 « J'aime »

Parfois ceux qui chialent ne savent même pas eux-mêmes sur quoi ils chialent…

8 « J'aime »

They’re mad at the construction (i.e. an excavator excavating), because apparently that’s proof of mismanagement or corruption

Link

4 « J'aime »

My guess is that it’s the bike path parallel to the REM, and they had to wait for the rest of the work to be done to start on it. But I might be wrong

c’est le gros bon sens de facebook

aka l’effet dunning kruger

2 « J'aime »

Any post that mentions how they’re “taxpayers” I immediately get a NIMBY attitude, especially on a Facebook group

Not to mention the REM is privately operated so not sure what taxpayers would be paying here

5 « J'aime »

So based on this link, and the plans, they are finishing the parking, walking path, bike path (south of the tracks) and the retention basin to the north of the tracks

I also noticed that the bike path no longer goes out to Rue Meighan in the official plans

3 « J'aime »

12 avril 2025

19 « J'aime »

I just noticed actually that on the map, the pedestrian link parallel to the tracks (i added it in red) is also missing…

It existed for DM so I doubt they would remove it, if they did then it would pretty quickly become one of those “desire paths” anyways lol

4 « J'aime »

Enfin !

Travaux d’aménagements extérieurs de la station Pierrefonds-Roxboro

Début mai 2025 à juin 2025

Travaux de pavage et finalisation des trottoirs au niveau de la station et des terminus de bus:

  • Pavage des stationnements
  • Activités de bétonnages
  • Travaux de remblai
  • Correction des déficiences

Juin 2025 à juillet 2025

Travaux d’aménagement paysager et de finition autour de la station :

  • Ensemencement
  • Installation du mobilier
  • Marquage
  • Installation de la signalétique
4 « J'aime »