Even in jurisdiction that have plenty of funding it’s always better to spend on services that reach new ares than serving already serve new corridor especially if it’s to compete and not to complement. Like it is fine to have a bus line close to a metro line if the bus really have a different purpose than the metro, but in the specific case of the REM it’s just trying to have the same founction especially now that it is confirmed that the two new downtown stations will be built.
What we should target to have real redundancy is, instead of having each corridor served by multiple lines, having a network that allows different paths in case of disruptions. For exemple, like we have in downtown in the REM, where if the REM is shut down you can take a longer, but stil feasible path with the different metro lines.
Basic redundancy is not bad they’ll keep a bus service like 141 after the blue line is extended and frequency will depend on demand meaning 20 to 30 minutes wait versus always frequent now. There could be a line from the South shore with stops at Griffintown and ETS but there’s no going back to 45, 90 and the separate lane.
C’est sur que si on veut un service qui double le REM en bus, simplement refaire la 45 ou 90 est une mauvaise idée. L’idéal c’est faire qqch proche du one-seat ride pré-REM, avec des lignes qui ont une desserte plus granulaire dans les quartiers (où qui font des arrêts dans GF/le quartier du multimédia).
Actuellement ces gens doivent prendre la STM à contre-sens donc un bus direct serait logique. mais on revient toujours au contexte multi-agences de Montréal. Le RTL c’est une chose, la STM une autre donc l’ile des soeurs a gardé tous ses arrêts intermédiaires.
Je crois que la différence revient au mode et à la configuration de la redondance. Un nouveau lien sur rail en « semi-parallèle » avec un lien existant peut aussi entraîner une hausse globale de l’achalandage du réseau, alors que nous savons qu’une ligne de bus ne génère pas vraiment de déplacements supplémentaires (et c’est encore pire si la ligne est parfaitement parallèle au trajet sur rail existant; voir les anciennes navettes « en cas d’urgence » du REM).
Je crois que le cas idéal est justement d’avoir une redondance à l’image des lignes verte et orange au centre-ville ou même des lignes bleue, orange et verte si on parle d’un trajet plus globalement dans l’axe est-ouest de la ville.
Le PSE dans sa mouture actuelle et le segment est de la ligne verte créeraient une redondance mutuelle, oui, mais iraient quand même chercher des clientèles différentes à plusieurs endroits. Ce n’est pas la même chose que de mettre en service une ligne de bus qui ne fait que suivre un chemin de fer.
Je trouve que, du moins en théorie, il y a des belles opportunités de semi-redondance entre Brossard et le Centre-ville.
Un train de banlieue lourd de Chevrier à la Gare Centrale via le pont Victoria.
Des autobus one-seat ride entre les quartiers résidentiels et le TCV, possiblement avec arrêts à Panama et rue William.
Navette rapide entre Panama et Longueuil–U-d-S
On pourrait ainsi chercher entre autre une certaine clientèle de travailleur de bureau qu’on a perdu avec l’arrivée du REM. Mais les obstacles aux idées 1 et 2 ne sont pas négligeables.
Sorry if this has already been mentioned, but the last few times i’ve taken the REM, it seems like the approach to the Samuel de Champlain bridge from Panama to IDS is much slower than before. We’re moving at a crawl whereas before it was essentially full throttle. Does anyone know why this is the case?
Redondance ≠ service de dédoublement. Offront un service efficace et fréquent sur l’axe Tascherau et on aura de la redondance avec le metro Longueuil. Mais rouler des bus vides coincés dans le traffic sur le pont c’est juste du gaspillage de ressources
Ca fais plusieurs fois que je l’entends dire qu’il faut rouler des bus sur les voies réservées di pont Champlain. Quelqu’un qui connait Catherine peut lui dire que le pont Champlain ne possède pas de voie réservées. Les voies qui été là étaient temporaires, rouler des bus a long terme sur les voies d’accotement risque d’user prématurément la structure du pont. La seule voie dédiée au transport en commun sur le pont et le tablier central.
But thats not at all the same scenario. The same scenario is running a frequent bus between Papineau and Longueuil to provide redundancy for the yellow line. 90% of the time it would be empty or almost empty cause the yellow line is superior, until a breakdown.
We don’t have the kind of the budget for that.
(I’m also aware that there is a bus between Longueil and Papineau ; it’s infrequent and exists for accessibility reasons)
I took the REM this week and it was fast on my way in and slower on my way back.
Maybe something about saving energy outside of peak hours (as long as the transit tines are met) or it was windy? Or maybe it was a hot day ( more stress to the rails?).
J’ai parlé aux techniciens en prévention du SIM l’année passée et on m’a informé que c’était régulièrement le cas.
Incendies causés
par des batteries
au lithium-ion
2022 : 24
2023 : 43
2024 : 71
Depuis 2022, une augmentation alarmante de 195 % des incendies causés
par les batteries et piles au lithium-ion a été observée sur le territoire du
SIM. Cette hausse est causée en grande partie par la popularité croissante
des appareils de micromobilité (trottinettes, vélos électriques, etc.), propulsés
par ce type de batterie
Ok but it would seem it’s not an alarming growth in the number of fires, it’s that there is exponential growth in the number of lithium-ion powered devices. 120 years ago there were very few automobile fires, too. As a percentage of Lion devices – I’m only guessing here – I actually think the number is going down. And as discussed in the video, the number of cheap, dangerous e-mobility devices has exploded over the last couple of years. I see dozens, if not hundreds, of electric motorcycles ridden by kids every day, usually dangerously, usually without helmets. How are kids affording these? It’s cheap junk. A properly-designed and made e-bike or e-scooter isn’t exactly cheap.
That’s exactly the reason behind the electric micromobility ban in the metro/REM. They simply don’t trust the user to have a legal/certified e-bike or e-scooter and the consequences for a battery fire in a confined environment are very severe.
The distribution of these illegal bikes and battery products is an issue to fix. Denying that there’s a problem won’t do anything.
I agree that it’s difficult, if not impossible, to police. In aviation, lithium battery powered devices are an even scarier risk, what with the explosion of availability of charging packs and e-cigarettes, not to mention mobile devices in general. There are strict rules put in place by the regulating authorities in different countries, as well as by the airlines themselves under common carrier laws. So yes, my scooter cannot be transported on a plane, either. But on a train or bus, while terrifying, it’s fairly easy to pull the emergency brake or notify the driver, and get the device off the train. Not so easy to do in midair lol!
Pourquoi ne pas appliquer les mêmes règles que Metrolinx?
Essentiellement, les vélos électriques certifiés UL ou CE sont autorisés, les inspecteurs sont formés pour les reconnaître et apposer un sceau d’approbation.
On a déjà des inspecteurs dans le REM qui cherchent à voir si un vélo est électrique ou non, ce n’est donc pas beaucoup plus de travail que ce qui se fait actuellement.
A battery fire in a tunnel and a crowded train still is an extremely bad situation to be in. It’s not the same caliber as a wood fire. The reaction is often very fast and releases a lot of toxic fumes, notably HF gas. Toxic gas inhalation is really what is feared, especially in a small train with inadequate ventilation. A vape or phone battery is still relatively small and easy to deal with, but an e-bike battery pack has enough fuel in it to cause heavy damage. I think the concern from the STM and REM is justified.