Le fréquence de service hors-pointe des stations de l’antenne (Sunnybrooke à DM) est maintenant affichée à 15 minutes sur le site du REM. Est-ce que c’était toujours comme ça me semble que c’était écrit 10 minutes mais pas sûr.
Fréquence lors de la mise en service complète du réseau
How much added light pollution will be emitted by lighting along the train line?
There are no headlights on REM cars and no lighting along the network. Direction indicators are present on REM cars—a white one at the front and a red one at the back.
Then why are there walkway illumination lights on viaducts on the network, many of which are turned on even during the day?
They’re required to be turned on for a potential evacuation. Most are located in areas of rescue assistance or nearby emergency exits. They are also only located where elevated evacuation walkways are.
Though I’m fairly sure I’ve never seen them turned on during the day on the South Shore operating segment. I’m guessing they’re just testing them when the catenary is deactivated.
Le REM a offert cette ancienne infrastructure ferroviaire aux municipalités concernées afin que ces dernières développent un projet permettant la circulation cycliste et piétonne entre Montréal et Laval. Une fois les analyses à ce sujet terminées, nous en saurons plus sur l’avenir de l’ancien pont ferroviaire.
Pour ce faire, nous devons maintenir la fermeture du sentier piéton reliant le parc des Arbres au parc des Rapides-du-Cheval-Blanc depuis la rue Perron. Nous prévoyons une démobilisation totale de nos équipements et infrastructures à l’automne 2025.