I hope so! It would be really disappointing to see the parking left like it is right now
Ça ferait du sens puisque d’après Google, il faut qu’il fasse au moins 10°C pour asphalter.
Parking lot infrastructure is being constructed.
You can see the cement structures being built.
Sorry for blurry photos,
I was in 28-099 with broken suspension.
28-? That’s not a “broken suspension,” it’s a “we won’t bother with this one.” 16 is on the limit.
yea they give us the crap ones they dont want to use downtown
More updates for the parking lot/ bus terminus.
Paving is imminent (they are watering the ground and making everything flat)
NouvLR photo spring 2024
There is still plenty of work for them to do at the station
I do not understand how they could have opened the stations this year with how much work is still left on the table
Hard to see but drones are being deployed for the work today
P.S, des sources boulevard is currently in HYPER CONSTRUCTION.
J’ai cru un instant que le lave-auto était intégré à la station
Le moins prêt des terrains du REM