Projet structurant de l’Est (PSE)

Converting to battery-electric MUs is so doable for a metropolis like Montreal, but there’s simply no will to do it. The Westmount sub can be electrified (and become a de facto surface metro) and overhead wires can be added at Vaudreuil, Candiac, St-Hilaire and St-Jerome. Exo management should be shown the door.

1 « J'aime »