# Signature Rive-Boisée - 6 étages

**URL:** <https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665>\
**Category:** Projets en construction\
**Tags:** 6-étages-à-119m, pierrefonds-roxboro\
**Created:** [Mai 26, 2024, 4:45 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665 "2024-05-26T04:45:44Z")\
**Posts on this page:** 13\
**Page:** 1

<div class="post-metadata">

**Author:** ![Alex514](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/alex514/32/123871_2.png) [@Alex514](https://forum.agoramtl.com/u/Alex514)\
**Post date:** [Mai 26, 2024, 4:45 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/1 "2024-05-26T04:45:44Z")

</div>

![image](https://uploads.agoramtl.com/original/3X/4/7/47424606b458c3b34805b26cf2d369ecbbacabee.jpeg)

Projet de 161 logements réalisé en remplacement d’un bâtiment commercial dans lequel se trouvait l’ancien bar Chez Paul.

> **Informations**
>
> Nom: **Signature Rive-Boisée**  
> Emplacement: **120, chemin de la Rive-Boisée - 14109 Boulevard Gouin Ouest - Lot lot 1 843 193**  
> Hauteur: **6 étages**  
> Architecte:  
> Promoteur: **Développement Signature**  
> Début et fin de la construction:  
> Dates importantes:
> 
> - **2024-08-05 :** Approbation des plans (PIIA)
> - **2024-08-24 :** Entente RMM
> - **2024-11-04 :** Permis de construction
> 
> Autres informations:
> 
> - **161 logements**
> 
> Sources des informations:
> 
> - **[Nos projets -](https://developpementsignature.com/nos-projets/)**
> - [CA 2024-08-05 - Dossier 1249141006](https://ville.montreal.qc.ca/documents/Adi_Public/CA_Pir/CA_Pir_ODJ_ORDI_2024-08-05_19h00_FR.pdf)

> **Localisation**
>
> ![image](https://uploads.agoramtl.com/original/3X/b/c/bc4654db0cc6c0623a97715ccddb4a1fab023621.jpeg)
> 
> ![image](https://uploads.agoramtl.com/original/3X/4/b/4b403c46bc5f322b7631611cb5cd3bbd48daf8ca.jpeg)

---

<div class="post-metadata">

**Author:** ![Alex514](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/alex514/32/123871_2.png) [@Alex514](https://forum.agoramtl.com/u/Alex514)\
**Post date:** [Août 3, 2024, 4:29 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/2 "2024-08-03T04:29:53Z")

</div>

Les plans (PIIA) seront approuvés au prochain conseil d’arrondissement (dossier 1249141006)

> P.I.I.A. pour la construction d’un bâtiment résidentiel, de la catégorie d’usages H4 (habitation collective) de six (6) étages et de cent soixante-et-un (161) logements, situé au 120, chemin de la Rive-Boisée, sur le lot 1 843 193 du cadastre du Québec.

> **[CA\_Pir\_ODJ\_ORDI\_2024-08-05\_19h00\_FR.pdf](https://ville.montreal.qc.ca/documents/Adi_Public/CA_Pir/CA_Pir_ODJ_ORDI_2024-08-05_19h00_FR.pdf)**
>
> 141.43 KB

---

<div class="post-metadata">

**Author:** ![vincemtl](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/vincemtl/32/67865_2.png) [@vincemtl](https://forum.agoramtl.com/u/vincemtl)\
**Post date:** [Octobre 17, 2024, 12:17 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/3 "2024-10-17T12:17:08Z")

</div>

L’entente dans le cadre du règlement métropole mixte date du **2024-08-24**. On y confirme 161 logements.

---

<div class="post-metadata">

**Author:** ![emmacardinal](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/emmacardinal/32/209444_2.png) [@emmacardinal](https://forum.agoramtl.com/u/emmacardinal)\
**Post date:** [Novembre 7, 2024, 6:50 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/4 "2024-11-07T06:50:13Z")

</div>

**4 novembre 2024**  
Plusieurs permis ont été émis.

- ID du permis: 3001787773
- Nature des travaux: CONSTRUCTION D’UN BÂTIMENT MULTIFAMILIAL (H4) DE 161 LOGEMENTS. (SOUS-SOL + 6 ÉTAGES + MEZZANINE EN VERTU DU RÈGLEMENT DE ZONAGE CA290040 ET 8 ÉTAGES EN VERTU DU CODE DE CONSTRUCTION DU QUÉBEC 2015) (ZIS)

# 

- ID du permis: 3001787433
- Nature des travaux: DEMOLITION D’UN BÂTIMENT COMMERCIAL D’UN ÉTAGE; ANNÉE DE CONSTRUCTION 1954

# 

- ID du permis: 3001787413
- Nature des travaux: DEMOLITION D’UN BÂTIMENT D’UN ÉTAGE; ANNÉE DE CONSTRUCTION 1967

# 

- ID du permis: 3001787453
- Nature des travaux: DEMOLITION D’UN BÂTIMENT COMMERCIAL D’UN ÉTAGE; ANNÉE DE CONSTRUCTION ± 1962

# 

- ID du permis: 3001787553
- Nature des travaux: CRÉATION D’UN NUMÉRO CIVIQUE 120 CHEMIN DE LA RIVE-BOISÉE

# 

- ID du permis: 3001787558
- Nature des travaux: NOUVEAU BRANCHEMENT D’ENTRÉES DE SERVICE POUR NOUVEAU BÂTIMENT DE 6 ÉTAGES ET 161 LOGEMENTS + CONDAMNER LES SERVICES EXISTANT DES 3 BÂTIMENTS EXISTANT SUR LE TERRAIN À DÉMOLIR

# 

- ID du permis: 3001787557
- Nature des travaux: ABATTAGE DE 2 ARBRES EN LIEN AVEC LE PROJET DE CONSTRUCTION D’UN BÂTIMENT MULTIFAMILIAL. (TEL QUE LE PLAN APPROUVÉ)

---

<div class="post-metadata">

**Author:** ![Ricky](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/ricky/32/47715_2.png) [@Ricky](https://forum.agoramtl.com/u/Ricky)\
**Post date:** [Décembre 16, 2024, 3:55 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/5 "2024-12-16T15:55:59Z")

</div>

I passed while driving last night, but couldn’t snag a pic due to time. Chez Paul and the garage look to have been cleared and only a fence remains.

---

<div class="post-metadata">

**Author:** ![Ricky](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/ricky/32/47715_2.png) [@Ricky](https://forum.agoramtl.com/u/Ricky)\
**Post date:** [Décembre 24, 2024, 6:20 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/6 "2024-12-24T06:20:05Z")

</div>

Mes excuses pour le qualité. C’est rare que je passe par là avant le coucher du soleil.

 ![IMG_6073](https://uploads.agoramtl.com/original/3X/d/3/d36c6d3e13f9162a673e94169a2b8b13e73a5fbc.jpeg)

---

<div class="post-metadata">

**Author:** ![Ricky](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/ricky/32/47715_2.png) [@Ricky](https://forum.agoramtl.com/u/Ricky)\
**Post date:** [Juillet 24, 2025, 9:21 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/7 "2025-07-24T21:21:09Z")

</div>

![IMG_8374](https://uploads.agoramtl.com/original/3X/0/d/0d296dba9d6289e47471111ae2a2d4581c4778b3.jpeg)

---

<div class="post-metadata">

**Author:** ![JacLan](https://cdn.agoramtl.com/letter_avatar_proxy/v4/letter/j/c68b51/32.png) [@JacLan](https://forum.agoramtl.com/u/JacLan)\
**Post date:** [Septembre 1, 2025, 12:50 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/8 "2025-09-01T00:50:04Z")

</div>

Hello everyone,  
I’m new here, and just wanted to add to this listing…

They were pouring concrete all day Saturday Aug 30th (Photo taken Sunday Aug 31st)

 ![120 Rive Boisee](https://uploads.agoramtl.com/original/3X/4/f/4ff070e8c14de161f100d31341ca84ca51451ed8.jpeg)

Here’s an action shot for those interested,  
It was really interesting to see this happening!

 ![Concrete Pour 120 Rive Boisee](https://uploads.agoramtl.com/original/3X/1/0/10c4ddbd9d4ac8c090a7cc0204f7ddf6e26c4413.jpeg)

---

<div class="post-metadata">

**Author:** ![JacLan](https://cdn.agoramtl.com/letter_avatar_proxy/v4/letter/j/c68b51/32.png) [@JacLan](https://forum.agoramtl.com/u/JacLan)\
**Post date:** [Septembre 25, 2025, 8:55 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/9 "2025-09-25T20:55:26Z")

</div>

Another updated photo.

 ![120 Rive Boisee Pour](https://uploads.agoramtl.com/original/3X/d/b/db329c677a3705d3e9d85e2d4bf5cf931ab0e8a0.jpeg)

---

<div class="post-metadata">

**Author:** ![Davies](https://cdn.agoramtl.com/letter_avatar_proxy/v4/letter/d/ecd19e/32.png) [@Davies](https://forum.agoramtl.com/u/Davies)\
**Post date:** [Octobre 13, 2025, 8:18 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/10 "2025-10-13T20:18:46Z")

</div>

What is collective housing?

---

<div class="post-metadata">

**Author:** ![Dom723](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/dom723/32/14_2.png) [@Dom723](https://forum.agoramtl.com/u/Dom723)\
**Post date:** [Octobre 13, 2025, 9:34 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/11 "2025-10-13T21:34:05Z")

</div>

Multi-residential (like a COOP), in difference from single unit housing

---

<div class="post-metadata">

**Author:** ![une.abeille](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/une.abeille/32/159494_2.png) [@une.abeille](https://forum.agoramtl.com/u/une.abeille)\
**Post date:** [Mai 31, 2026, 10:23 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/12 "2026-05-31T22:23:51Z")

</div>

Pas beaucoup des progrès

 ![AGC_20260531_133810766](https://uploads.agoramtl.com/original/4X/5/c/6/5c67e17032785810b00e1b31b95cb3f9f89e05a4.jpeg)

---

<div class="post-metadata">

**Author:** ![Freesgab](https://cdn.agoramtl.com/letter_avatar_proxy/v4/letter/f/7ea924/32.png) [@Freesgab](https://forum.agoramtl.com/u/Freesgab)\
**Post date:** [Juillet 2, 2026, 2:57 UTC](https://forum.agoramtl.com/t/signature-rive-boisee-6-etages/7665/13 "2026-07-02T14:57:14Z")

</div>

Le site semble avoir été laissé un peu pour compte depuis la fin avril. Le site donne directement sur la rivière, et il a été partiellement inondé par la crue printanière. Depuis, je n’ai pas vu de nouvelle activité sur le chantier. Je passe devant presque à tous les jours et je n’ai pas vu d’employé depuis les crues.

Le 20 juin dernier, le boulevard Gouin et le chemin de la Rive-Boisée ont été inondés pendant quelques heures, après une centaine de millimètres de pluie tombée sur Pierrefonds. Il est possible que cela ait affecté le chantier.
