900 Saint-Jacques - 62 étages


13 Likes

Nice shots.

I keep imagining if Dépotium and TQ moved away and the CN Overpass could be beautified and rebuilt to serve the neighbourhoods on both sides, with local shops and entertainment establishments in the arcades. Of course, I have no idea how much interior space the CCUM pipes take up, but I mean if a storage facility fits in there, surely some enterprises can occupy the arches on each side.

1 Like

They really don’t take much, the Dépotium is on 2 stories inside the viaduct, sure it’s low ceiling below the tracks on the second floor & you feel and hear the trains, but is that middle floor would be removed, it would create a great big space bellow the tracks.

2 Likes

14 Likes

Je me demande si tous ces nouveaux bâtiments seront reliés en sous-sol au RÉSO :thinking:

Seulement 700 et 800 Saint Jacques.

1 Like

Une petite prise de vue en passant à côté :+1:

5 Likes

14 Likes

Avec la Banque Nationale en backdrop

11 Likes

15 Likes

4 octobre

11 Likes

6 Likes

Bon, à votre avis, qui achètera le lot de l’autre côté du centre de données? J’ai l’impression que Brocolini sera bientôt à la recherche d’un nouveau terrain maintenant que Le Sherbrooke a démarré.

Tu parles du terrain directement à l’ouest ? Ce serait Jadco : Corporation Jadco (Saint-Jacques / la Cathédrale / Montfort / A720) - 120m - Projets immobiliers / Projets en planification - Agora Montréal (agoramtl.com)

Si tu parles de celui au sud (sur Notre-Dame), je dirais Canvar ou Brocco

Doesn’t Jadco still also have the Nouvelle Vague property between St-Maurice and St-Paul?

7 Likes

Il y aura une nouvelle grue ?

22 Likes

Oui !

15 Likes

21 Likes