# 1383-1389 Sainte-Catherine Ouest - ~20 étages

**URL:** <https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953>\
**Category:** Projets en planification\
**Tags:** 6-étages-à-119m, ville-marie\
**Created:** [Mars 13, 2025, 11:50 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953 "2025-03-13T11:50:33Z")\
**Posts on this page:** 20\
**Page:** 1

<div class="post-metadata">

**Author:** ![vincemtl](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/vincemtl/32/67865_2.png) [@vincemtl](https://forum.agoramtl.com/u/vincemtl)\
**Post date:** [Mars 13, 2025, 11:50 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/1 "2025-03-13T11:50:33Z")

</div>

![Projet de tour édifice Coronation](https://uploads.agoramtl.com/original/3X/3/7/37779d83e19655eed38460f08aad3f67b4a27b8c.jpeg)

Projet mixte d’environ 20 étages adjacent à l’édifice Coronation.

> **Informations**
>
> Nom:  
> Emplacement: **1383-1389 Sainte-Catherine Ouest**  
> Hauteur: **Environ 20 étages**  
> Architecte:  
> Promoteur: **Immeubles Prime Inc**  
> Début et fin de la construction:  
> Dates importantes:  
> Autres informations:
> 
> Sources des informations:
> 
> - **[Carrefour Lobby Québec](https://www.carrefourlobby.quebec/afficher/mandat/publique/ad402c3c-375a-4930-98a1-3fbac488c3b1/ea0f78af-75b3-406c-9218-1d56dbe86c3b/details-loc)**

---

<div class="post-metadata">

**Author:** ![vincemtl](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/vincemtl/32/67865_2.png) [@vincemtl](https://forum.agoramtl.com/u/vincemtl)\
**Post date:** [Mars 13, 2025, 11:54 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/2 "2025-03-13T11:54:13Z")

</div>

[Mandat de lobbyisme récent](https://www.carrefourlobby.quebec/afficher/mandat/publique/ad402c3c-375a-4930-98a1-3fbac488c3b1/ea0f78af-75b3-406c-9218-1d56dbe86c3b/details-loc)

> **Période du mandat**
> 
> Du 2025-03-18 au 2026-03-12
> 
> **Résumé du mandat**
> 
> Accompagner et représenter le client auprès de l’arrondissement de Ville-Marie et la Ville de Montréal dans le cadre d’un projet de redéveloppement mixte sur la rue Sainte-Catherine Ouest concernant les lots 1 341 051, 1 341 097 et 1 341 098.
> 
> **Contrepartie reçue ou à recevoir pour l’exercice des activités de lobbyisme**
> 
> De 10 000 $ à 50 000 $

> **Objectif (s)**
> 
> - Modifier le plan d’urbanisme et les règlements d’urbanisme afin de notamment permettre de plus grandes densités d’occupation et hauteurs.
> 
> (…)
> 
> **Objectif (s)**
> 
> - Autoriser un projet de redéveloppement mixte d’environ 20 étages adjacent à l’Édifice Coronation.

On parle d’un édifice de 20 étages à côté de l’édifice Coronation (celui au coin de la rue):

https://www.google.com/maps/embed?pb=!4v1741866787836!6m8!1m7!1sEdqFXrvA423Ho06WPDZj6A!2m2!1d45.49671688574311!2d-73.57617982153428!3f304.77712562226236!4f21.461109712784662!5f0.7820865974627469

Le projet occupe la majorité des édifices sur Sainte-Catherine, sauf un. C’est asez majeur.

Ça semble remplacer ce projet:

> [@1383 rue Sainte-Catherine O. - 8 étages](https://forum.agoramtl.com/t/1383-rue-sainte-catherine-o-8-etages/1614):
>
> Projet commercial comprenant la construction d’un édifice de 8 étages et l’ajout de 4 étages au-dessus du Coronation Building. arrow_forward Informationsarrow_forward Extrait du registre des lobbyistes

---

<div class="post-metadata">

**Author:** ![trefle\_incarnat](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/trefle_incarnat/32/128494_2.png) [@trefle\_incarnat](https://forum.agoramtl.com/u/trefle_incarnat)\
**Post date:** [Mars 13, 2025, 1:57 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/3 "2025-03-13T13:57:43Z")

</div>

Une demande de 20 étages directement adjacent à la rue Sainte-Catherine ? Quelles sont les chances qu’ils obtiennent une réponse positive de la Ville ? Cela me semble bien optimiste.

---

<div class="post-metadata">

**Author:** ![vincemtl](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/vincemtl/32/67865_2.png) [@vincemtl](https://forum.agoramtl.com/u/vincemtl)\
**Post date:** [Mars 13, 2025, 2:15 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/4 "2025-03-13T14:15:07Z")

</div>

On a déjà vu des autorisations pour du ~15 étages sur Sainte-Catherine dans l’ouest. Avec les objectifs de densification, si le projet est de qualité et n’écrase pas la rue, je ne serais pas surpris que ça ne cause pas de problème.

---

<div class="post-metadata">

**Author:** ![Mondo\_Grosso](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/mondo_grosso/32/15_2.png) [@Mondo\_Grosso](https://forum.agoramtl.com/u/Mondo_Grosso)\
**Post date:** [Mars 13, 2025, 3:36 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/5 "2025-03-13T15:36:51Z")

</div>

Je pense que les chances sont bonnes. Il y a un immeuble de 20 étages juste derrière, sur Crescent. Il y a aussi le pavillon Concordia, qui équivaut à un immeuble de 20 étages. La crise du logement reste un problème urgent, c’est donc dans leur intérêt.

Je ne vois pas un projet à cet endroit susciter beaucoup d’opposition de la part des résidents.

---

<div class="post-metadata">

**Author:** ![Windex](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/windex/32/18_2.png) [@Windex](https://forum.agoramtl.com/u/Windex)\
**Post date:** [Mars 14, 2025, 2:37 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/6 "2025-03-14T14:37:11Z")

</div>

![image](https://uploads.agoramtl.com/original/3X/c/e/ce882e3552c8da90b627d20c85a34f095060e861.png)

---

<div class="post-metadata">

**Author:** ![dmg](https://cdn.agoramtl.com/letter_avatar_proxy/v4/letter/d/5e9695/32.png) [@dmg](https://forum.agoramtl.com/u/dmg)\
**Post date:** [Mai 23, 2025, 10:36 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/7 "2025-05-23T10:36:54Z")

</div>

La propriété est vendue selon Avison Young

> **[\#succes #success #transaction #sold #vendu #redevelopment #urban #urbain… |...](https://www.linkedin.com/posts/marie-claire-laflamme-sanders-5b654450_succes-success-transaction-activity-7331413374011887616-9tUg?utm_medium=ios_app&rcm=ACoAACMV-VkBYHR3_ybx-90wpZ-7RjgX18ciXOU&utm_source=social_share_send&utm_campaign=copy_link)**
>
> Au nom de l’Équipe des Marchés des Capitaux du Québec d’Avison Young, je suis fière de vous partager la vente du 1379-1397, rue Sainte-Catherine Ouest, un futur projet de redéveloppement urbain idéalement situé au cœur du centre-ville de...

---

<div class="post-metadata">

**Author:** ![jacuzzi](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/jacuzzi/32/310830_2.png) [@jacuzzi](https://forum.agoramtl.com/u/jacuzzi)\
**Post date:** [Mai 23, 2025, 3:52 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/8 "2025-05-23T15:52:47Z")

</div>

c’est drôle, je disais à ma conjointe la semaine dernière que c’est un excellent site à redévelopper (je parlais des 5 petits commerces)

---

<div class="post-metadata">

**Author:** ![Mondo\_Grosso](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/mondo_grosso/32/15_2.png) [@Mondo\_Grosso](https://forum.agoramtl.com/u/Mondo_Grosso)\
**Post date:** [Juillet 13, 2025, 12:59 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/9 "2025-07-13T00:59:05Z")

</div>

Ça bouge, les commerces commence à déménager, il y a a des affiches qui offre déjà de louer les futures locaux.

 ![PXL_20250713_004423841](https://uploads.agoramtl.com/original/3X/8/b/8b12a2f282db20aa7f4efc75ae1bc42eef839154.jpeg)  
 ![PXL_20250713_004200078](https://uploads.agoramtl.com/original/3X/4/9/49349a7e076f62e67e34e93231e6ea5f9f869f58.jpeg)  
 ![PXL_20250713_004137020](https://uploads.agoramtl.com/original/3X/4/0/4029bd18ad191512207bd43454d8f25d9714a183.jpeg)  
 ![PXL_20250713_004406894](https://uploads.agoramtl.com/original/3X/7/0/70edeeccac525eabe1574c4e26fa852a7778237c.jpeg)  
 ![PXL_20250713_004411323](https://uploads.agoramtl.com/original/3X/4/7/47726d0e45d3a1fcbd7ffe105a0b359e38b9579b.jpeg)  
 ![PXL_20250713_004421837](https://uploads.agoramtl.com/original/3X/5/1/5171e78ec578fbf399bdfb821a3ea0ab21360eab.jpeg)

---

<div class="post-metadata">

**Author:** ![vincemtl](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/vincemtl/32/67865_2.png) [@vincemtl](https://forum.agoramtl.com/u/vincemtl)\
**Post date:** [Octobre 9, 2025, 12:49 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/10 "2025-10-09T12:49:52Z")

</div>

En attendant un projet, il y a des modifications au rez-de-chaussée de cet édifice (comme on avait déjà vu dans un compte rendu du CCU).

> #### Travaux extérieurs-intérieurs
> 
> **ID Permis:** 3001881334  
> **Emplacement:** 1391 rue Sainte-Catherine Ouest  
> **Arrondissement:** N/A  
> **Nb logements:** 0  
> **Date émission:** 2025-09-30
> 
> * * *
> 
> Au sous-sol et au rez-de-chausée, aménager 5 suites commerciales. À la facade de la rue Bishop, modifier les entrées existantes. À la facade de la rue Sainte-Catherine, ajouter deux entrées et modifier les deux entrées existantes, tels qu’aux plans approuvés.

---

<div class="post-metadata">

**Author:** ![Alex514](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/alex514/32/123871_2.png) [@Alex514](https://forum.agoramtl.com/u/Alex514)\
**Post date:** [Octobre 9, 2025, 1:15 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/11 "2025-10-09T13:15:14Z")

</div>

Je ne crois pas que ça soit des travaux d’agrandissement pour l’instant.

[https://www.cbre.ca/fr-CA/properties/commercial-space/details/CA-Plus-69351/1379-1381-sainte-catherine-street-w-montreal-quebec-h3g-1r1](https://www.cbre.ca/fr-CA/properties/commercial-space/details/CA-Plus-69351/1379-1381-sainte-catherine-street-w-montreal-quebec-h3g-1r1)

 ![image](https://uploads.agoramtl.com/original/3X/0/4/04dab16e306c14b3659efaf72bac8d50dc3da1f7.jpeg)

Actuellement:

 ![image](https://uploads.agoramtl.com/original/3X/c/e/ce30aecdc56acf1cb6fd26fb666ad4be0d2d53be.jpeg)

---

<div class="post-metadata">

**Author:** ![Dom723](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/dom723/32/14_2.png) [@Dom723](https://forum.agoramtl.com/u/Dom723)\
**Post date:** [Octobre 9, 2025, 8:02 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/12 "2025-10-09T20:02:56Z")

</div>

![IMG_2896](https://uploads.agoramtl.com/original/3X/c/0/c066858eb5232f6f77b7a676ec2ef125307a0f0d.jpeg)

---

<div class="post-metadata">

**Author:** ![Martin](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/martin/32/43_2.png) [@Martin](https://forum.agoramtl.com/u/Martin)\
**Post date:** [Octobre 12, 2025, 7:37 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/13 "2025-10-12T19:37:27Z")

</div>

L’édifice Coronation (construit en 1911)

Coin NE Ste-Catherine et Bishop

Vue en 1913

 ![1913.04.19Standard essor éd. Coronation](https://uploads.agoramtl.com/original/3X/4/b/4b4979a74208a480fb2832580034a2b92c397250.png)

et et 1985.

 ![1985oa rattcumArchComm.III 118](https://uploads.agoramtl.com/original/3X/c/b/cb4acf025511420a7ba6ddd3a6179dbbcf5cd967.jpeg)

---

<div class="post-metadata">

**Author:** ![Dom723](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/dom723/32/14_2.png) [@Dom723](https://forum.agoramtl.com/u/Dom723)\
**Post date:** [Octobre 25, 2025, 6:13 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/14 "2025-10-25T18:13:43Z")

</div>

![IMG_3173](https://uploads.agoramtl.com/original/3X/f/1/f12b24de3f4774e1ae291d82b07ffe5fc99a6ad3.jpeg)

---

<div class="post-metadata">

**Author:** ![Sorhi](https://cdn.agoramtl.com/letter_avatar_proxy/v4/letter/s/73ab20/32.png) [@Sorhi](https://forum.agoramtl.com/u/Sorhi)\
**Post date:** [Décembre 27, 2025, 10:56 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/15 "2025-12-27T22:56:01Z")

</div>

![IMG_0510.HEIC](https://uploads.agoramtl.com/original/4X/5/8/6/586d9f95a494c0ea8a83e8c67349a271b54e24bf.jpeg)  
 ![IMG_0508.HEIC](https://uploads.agoramtl.com/original/4X/9/c/0/9c0d8ee2472bfaf959393b3a57b505a3824a9028.jpeg)

---

<div class="post-metadata">

**Author:** ![sami\_mtl](https://cdn.agoramtl.com/letter_avatar_proxy/v4/letter/s/cc9497/32.png) [@sami\_mtl](https://forum.agoramtl.com/u/sami_mtl)\
**Post date:** [Avril 9, 2026, 10:59 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/16 "2026-04-09T22:59:18Z")

</div>

They removed the boards, and the site was busy today. Only took this one picture, was in a rush 🙏

 ![IMG_8255](https://uploads.agoramtl.com/original/4X/8/f/8/8f87ccca35127c95fbe4a02c85c1280c6dd99439.jpeg)

---

<div class="post-metadata">

**Author:** ![Dom723](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/dom723/32/14_2.png) [@Dom723](https://forum.agoramtl.com/u/Dom723)\
**Post date:** [Avril 26, 2026, 5:53 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/17 "2026-04-26T17:53:05Z")

</div>

![IMG_4384](https://uploads.agoramtl.com/original/4X/d/7/5/d7533a9617e02fa9b50ad1eed91e163b4ed7b9b2.jpeg)

---

<div class="post-metadata">

**Author:** ![Dom723](https://cdn.agoramtl.com/user_avatar/forum.agoramtl.com/dom723/32/14_2.png) [@Dom723](https://forum.agoramtl.com/u/Dom723)\
**Post date:** [Octobre 4, 2026, 7:12 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/18 "2026-10-04T19:12:17Z")

</div>

3 nouveaux locataires (Nouilles Langzhou, Adelina (pâtes fraîches) & Projet Séoul)

 ![IMG_7362](https://uploads.agoramtl.com/original/4X/d/b/b/dbbd1bc6417b279782ed39e8c7941c97c52fda89.jpeg)  
 ![IMG_7360](https://uploads.agoramtl.com/original/4X/f/c/a/fca0b2715bcbf16df8a984c7210c0293640a98ad.jpeg)  
 ![IMG_7361](https://uploads.agoramtl.com/original/4X/3/5/1/3515a3a34824384bd63424888086df76da9ddea6.jpeg)

---

<div class="post-metadata">

**Author:** ![Sorhi](https://cdn.agoramtl.com/letter_avatar_proxy/v4/letter/s/73ab20/32.png) [@Sorhi](https://forum.agoramtl.com/u/Sorhi)\
**Post date:** [Octobre 4, 2026, 9:09 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/19 "2026-10-04T21:09:30Z")

</div>

Juste après

 ![IMG_1061.HEIC](https://uploads.agoramtl.com/original/4X/c/5/b/c5bfb3969dc350e896b5b52fb0b85cee8241edfe.jpeg)  
 ![IMG_1060.HEIC](https://uploads.agoramtl.com/original/4X/4/c/6/4c6d3602f43023faac2ec93de68148ed8a4c1290.jpeg)

---

<div class="post-metadata">

**Author:** ![FunkyCatMan](https://cdn.agoramtl.com/letter_avatar_proxy/v4/letter/f/53a042/32.png) [@FunkyCatMan](https://forum.agoramtl.com/u/FunkyCatMan)\
**Post date:** [Octobre 5, 2026, 2:35 UTC](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953/20 "2026-10-05T14:35:06Z")

</div>

Je comprends mal ce projet, puisqu’il n’y a pas de maquette visuelle offerte. Est-ce que l’édifice Coronation deviendra la ‘‘base’’ du nouvel immeuble de 20 étages, ou si ce dernier sera uniquement construit à côté (est)?

[Page suivante](https://forum.agoramtl.com/t/1383-1389-sainte-catherine-ouest-20-etages/9953.md?page=2)